brief & evaluationsite surveyspace allocation programmeoffice conceptcolour & material conceptproject budget & cost estimationfurniture designsignage & guidance systempre-planningapproval planningpurchase & feasibility studiesdevelopment of repositioning conceptsrestructuring from single to multi-tenant capabilityrevitalizationtotal renovationtenant integration & usage planningmarketing support through conceptual design and realization of a marketing lounge and a model officereal estate marketing supportproject cost control and management
LPH 1-2 + preliminary building application
Revitalization of the factory administration building in the urban transformation area of Wedding
New construction of an urban high point as urban redensification within the framework of the Berlin Urban Development Concept 2030
Core renovation of existing buildings with value retention of the supporting structures
Renewal of the entire thermal envelope and reconstruction of all building services systems and equipment
Additions and partial deconstruction as a basis for a 2-storey extension of the existing buildings
Restructuring of the existing building system from single-tenant to multi-tenant structure
15-story new building as new high point and prelude to the quarter
Extension of the single-story low level with central technical areas and bicycle garage
Urban planning and open space integration into the adjacent sports/leisure facilities area
Planning of the open space and riparian zone and continuation of the renaturation of the Panke river
Development of a hybrid overall structure with semi-public urban alleyway
ground-floor neighborhood uses (gastronomy, small businesses) and office uses on the first floors
Space
15.000 qm Bestand Kernsanierung / 24.000 qm Neubau